Verified DMTCL · Mass Rapid Transit

Dhaka Metro Rail

MRT Line 6 · Uttara North to Motijheel

Bangladesh's first metro rail. The complete MRT Line 6 guide: 16 stations across 21.26 km in about 38 minutes, with fares from 20 BDT to 100 BDT.

RouteUttara North to Motijheel · 21.26 km

First / last train06:30 / 22:30 (Sat–Thu)

Frequency5–20 min (5–6 min peak)

Fares20 BDT – 100 BDT

  • Operated by DMTCL
  • 16 stations
  • Fares from 20 BDT

Uttara North to Motijheel

16 stations · ~38 minutes end-to-end

Uttara North North terminalMirpur 10 · Agargaon · FarmgateShahbagh · Dhaka University · SecretariatMotijheel South terminal

First train

06:30

Uttara North · Sat–Thu

Last train

22:30

Motijheel · Sat–Thu

On Fridays service starts at 15:00 (Uttara North) / 15:20 (Motijheel). MRT Pass holders can ride from 07:10.

Operating hours

When the metro runs

First and last trains from each terminal, with frequency by time of day.

Saturday – Thursday

Uttara North to Motijheel06:30 to 21:50

Motijheel to Uttara North07:15 to 22:30

Friday

Uttara North to Motijheel15:00 to 21:50

Motijheel to Uttara North15:20 to 22:30

Token sales open 14:45. MRT Pass holders ride from 07:10.

Frequency (Sat–Thu)

  • Peak (08:00–10:00, 17:00–19:00)5–6 min
  • Midday8 min
  • Off-peak / evening10–12 min
  • First & last of day20 min
The line

All 16 stations

Every MRT Line 6 station from north to south, with approximate first and last train times (weekday schedule).

Approximate times
Dhaka Metro Rail MRT Line 6 station list and timetable
StationAreaToward Motijheel (First)Toward Motijheel (Last)Toward Uttara North (Last)
Uttara North TerminalDiabari06:3021:50—
Uttara CentreUttara Model Town06:3521:5522:35
Uttara SouthUttara06:3821:5822:32
PallabiMirpur corridor06:4222:0222:28
Mirpur 11Mirpur06:4522:0522:25
Mirpur 10 BusyMirpur roundabout06:4822:0822:22
KaziparaMirpur06:5222:1222:18
ShewraparaShewrapara06:5522:1522:15
Agargaon InterchangeAgargaon06:5822:1822:12
Bijoy SaraniTejgaon07:0222:2222:08
Farmgate BusyFarmgate07:0522:2522:05
Karwan BazarKarwan Bazar07:0822:2822:02
Shahbagh PopularShahbagh07:1222:3221:58
Dhaka UniversityUniversity of Dhaka07:1522:3521:55
Bangladesh SecretariatSecretariat07:1822:3821:52
Motijheel TerminalFinancial district——22:30
Stations 16·Length 21.26 km·Travel time ~38 min
Station times are estimates based on terminal departures.
Fares

Dhaka Metro Rail fares

Distance-based fares from 20 BDT to 100 BDT. MRT Pass gives a 10% discount on every journey.

1–2 stations20 BDTMinimum
3–4 stations30 BDT
5–6 stations40 BDT
7–9 stations60 BDT
10–12 stations80 BDT
Full route100 BDTMaximum

MRT Pass — save 10%

The MRT Pass is a contactless NFC smart card — tap in, tap out, and the correct distance-based fare is deducted automatically with a built-in 10% discount.

  • Costs 500 BDT — 300 BDT travel credit + 200 BDT card
  • Valid 10 years · holds up to 10,000 BDT

Recharge at any station's Ticket Vending Machine (TVM) or customer service counter — cash or mobile banking (bKash, Nagad, Rocket, Upay).

  • Minimum recharge 100 BDT (multiples of 10 BDT)
  • Single Journey Ticket (SJT) for occasional riders

About MRT Line 6

Bangladesh's first metro rail, operated by DMTCL. Phase 1 (Uttara North to Agargaon) opened 29 December 2022; the full route to Motijheel opened 5 November 2023.

Kamalapur extension

A 1.16 km extension from Motijheel south to Kamalapur Railway Station is under construction (target opening 1 January 2027).

FAQ

Dhaka Metro Rail questions

The questions passengers ask most about MRT Line 6.

What are the Dhaka Metro operating hours?

Saturday–Thursday the first train leaves Uttara North at 06:30 and Motijheel at 07:15; last trains are 21:50 and 22:30. On Fridays service runs 15:00–22:30.

How much is the Dhaka Metro fare?

Fares are distance-based from 20 BDT (1–2 stations) to 100 BDT for the full route. The MRT Pass gives a 10% discount.

Does the metro run on Fridays?

Yes, but from 15:00 (Uttara North) / 15:20 (Motijheel). MRT Pass holders can ride from 07:10.